Maa Shaa Allah Project Going Smooth As I Wanted ...
Did My Visit To Pakistan ...
Had A Good Time & Completed Many Work Nearly 60% ...
So Far Below Is The Pending Work Left ...
[B]
Engine & Gear :
Aeromotive 11140 Fuel Pump 340lph Stealth Pump (Pending Installation)
Nitro 4.88 Ratio, Nitro Front & Rear Gear Kit (Pending Installation)
The "TRU FLOW" Toyota Timing Chain Kit (Pending Installation)
50mm 13 Row AN-10/AN10 Double - Deck Oil Cooler Hose Filter Relocation Kit (Pending Installation) [B]
[B][B][B][B][B]Heat, Rust & Sound Control System :
DYNAMAT 72 Sq ft Heat & Sound Proofing Inside (Pending Installation)
Rubber Coating Water & Rust Proofing Under Chassis (Pending Installation) [B]
Suspension, Break System & Axles :
[B]Nitro Chromoly Birfield & Axel Kits (Pending Installation)
30 Spl, Nitro Chrmoly Rear Axel Kit (Full Float, Pair) (Pending Installation)
Heavy Duty Axles & Bearings Kit by NITRO (Pending Installation)
Draglink Chrome Moly 4140 Steering Arm 38mm (Pending Installation)[B]
Solid Chrome Moly 4140 Tierod Rock Rod 38mm (Installed)
[B]
[B][B]Bumpers & Winch :
Front Off-Road Bumper (Custom Design In Process)[B]
Rear Off-Road Bumper (Custom Design In Process)
Winch Warn Zeon 10 Premium Series (Pending Installation) [B]
Performance Parts :
ARB Safari Snorkel V-Specs SS81HF (Purchased Only)
HPS RED Reinforced Silicone Radiator + Pesky Heater Hose Kit (Pending Installation)
Lighting System:
Rigid Industries Radiance 50" Red Back Light LED Bar - 25002 (Pending Installation)
Rigid Industries Radiance 30" Red Back Light LED Bar - 23002 (Pending Installation) [B]
Entertainment System : (Pending Installation)
[B][B][B][B][B][B]
[/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B][/B]