Meanwhile, the body was being painted, original propeller shafts bought from Bilal Ganj.
Shafts resized to accomodate the re-location of engine & drive train i.e., rear shaft lengthened and front shaft shortened.
New US made crosses fitted and shafts installed.
@a_k
You have sharp eyes! Yes, the project was started long ago and it took a long time.