Country’s railway tracks in poor condition – Here’s what you need to know

Railways in Pakistan needs due attention because about 1482 unmanned level crossings on operational sections and approximately 80 percent of the bridges and railway tracks are expired in fact they have passed the very due date of expiry. Even the officials have said that in order to avoid any serious accident or mishap.

The bridges are even 100 years old. Even though they are being rehabilitated and maintained but still, they require special attention to avoid any accidents.

With respect to the classification of tracks, i.e. the tracks which are overage in the railway system, the list is as follows:

In the operational sections of Pakistan Railways, there are approximately 2777 level crossings. Out of which 1482 are Unmanned, and 1295 are Manned.

As per the prescribed standard, in order to maintain the Level Crossings, a regular inspection of Level Crossings (Road Portion and Track Portion) is being done by the Field Engineers and Supervisors.

As per schedule and standards for the safe running of the trains, the parameters of the track are fully maintained. But, annually a complete overhauling of all level crossings are carried out. The Road owning authorities are responsible for the maintenance and bearing the cost of Level Crossing in case of the deposit work. The sponsoring agencies are responsible for the maintenance charges of the maintenance carried out in the Railway System.

Exit mobile version