The fuel tanks, not really ready yet. As seen at the picture below I will connect the two tanks with a pipe between a small "box" at each tank.
The fuel meter is the last of three VDO meters I will use (RPM and speed is the others).
Exhaust system will be all 3".
Intercooler and some piping.
Rebuilt exhaust manifold.
I've had so many of these, but noone was really in such a good shape.