Hello!
well this Sunday...i spent around my 6 hours on Big D.I.Y of my NIssan..........! its asking for D.I.Y from so many months...so finally on 22-04-07...i though of doing that...!
This D.I.Y Includes...
- Complete Intercleaning.....!
- A/C Insulation Pipe For Heat Proofing....!
- Installing Tweeters
and other lil stuff.....!
This D.I.Y is big so there are lot of pictures.....will take time to load as i try to make them small in size as i can....so sit back and wait for loading pics...!
Here we begins.....!
1.Here We Go.....Seats Are Out..Opening Front Ones...!

2.Front View Before Opening....!

3.Carpet Is Removed.....Its Removed 1st Time..As You Can See UnderLay Is Still Stucking On Floor...!

4.See It...Its All Genuine 

5.Front Seats Laying Outside Along With Panel....! Happy Landing 

6.Here Comes Rear Seats.......!

7.Its What I Hate.......Central Locking & Power Windows Wiring Mess.!!

8.Clean Floor.........!

9.Thats What I Wan't......NISSAN Printed It Out Everywhere 

10.Finally My NISSAN Engine Bay Pics........!Its All Dirty Bcz Khi Roads Are Not Less Than Deserts NowDays...!

- High Tension 8mm Silicon Wires.....!

12.My Custom Made Cold Air Intake Setup....!Getting Air From Left Fender....

13.Bosch Brazil IGN Coil Is Hiding Beneath CAI Piping...!

- AGS XL85 With Charging Light Indicator Doing Its Job..

- The Imp Thing In Engine Room...Clean VIN Plate...!Showing Old 1.0L Engine Which Is Now 1.5L And Chassis Type

Installing A/C Insulation Pipe....
16.Here Is The Pipe I Am Gonna Use...It Get It From WholeSale A/C Spares Shop...Its Used In SplitUnits Piping .... Get It For Cheap 

- A/C Piping Gets Exteremly Hot As Radiator Piping Is Passing NearBy As Well As Hot Temp Out...So That Effects A/C Cooling....A/C Piping Before Installation....

- Piping Being Installed & Taped....!Looks Like 3rd Radiator Pipe

- Cleaning Carpet With Carpet Cleaner :).....Heey..Its My Feet

- Its Around 2 Pm And Sun Paying No Mercy....
Enjoying Some Music....!

- I Also Have To Install Tweeters Which Are Laying Inside Dashboard From Atleast 7 Months

- My Partner In Intercleaning.......WooM Woom...

- Finally DashBoard Is Also Out And Wiring Are All Around....!

- Tweeters Being Wired And Checked...!

- Another Thing I Open....Console Panel Is Also Out...! I Am Gone Nuts .....T























