Dear All,
With the help of your support and guidance, my project is going well and InshAllah will be able to complete as good as possible.
So far, I have changed the Color the Gray (Matte Finish), replaced Brake Booster & Master Cylinder and rebuild 2F Engine. I am very fortunate and changed the following items:
- Ring kit Only 0.25
- Valves
- Oil pump
- Water body
- Rebuild Clutch Plate (leather)
- Rebuild Fly Wheel and Pressure plate
- Grinding Crank shaft Main (0.25 -> 0.50) and Bearing (0.50 -> 0.75)
- Gasket
- Gear Main seal
- Distributor O ring
(Soon I shall post entire cost of operation)
Approx cost and with labor Rs. 20,000/-which seems satisfactory to me after drive. I ensure that engine rebuild should be performed by book, therefore, engine starts at first ignition.
I am uploading pics of recent development.