Day 15
27-11-07
Well Today...So Much Work To Do As He Have Some Serious Load Of Work To Do...So Now He Trying Best To Cover Work As Soon As He Can...!
Here Are Today's Update
4AGE 20V 2-1 Piping Piece...! I Finally Get It 

Potohar Custom Made Headers Ready To Go.. 

Nicely Built...Awsome Work He Did (y)

Finally Fuel Tank Out To Have Fuel Pump Inn...

Here Is It....We Broke It Later And Get Another One Like It... 

The Fuel Collecting Bowl We Make To Fit Inside Fuel Tank To Backup Fuel Pump While Car Is Cornering...!

Its Clean From Inside....!!

Ready...Fuel Backup Bowl Fixed Inside...! Now Fuel Pump Needed To Get Installed Finally...!!

We Make A Incision In Body For Taking Out Fuel Pump Later If Needed In Future...!! And Later Make Cover For It Also...!

Here's 2-1 Piece Having Bolt-Up End...Easy For Us Now To Remove It When Needed In Future....!

Here Comes Down-Piping With Bends..!!

Stock Vs New Piping :P....!

Guess The Size...!!

Let Me Measure It...! Yoo..60mm Outer...!

Inner Dia....55mm Means 2.25" (y) Perfect !

Strut Bars In Place....! Still Need 1 Side Bolts Of Bars To Installed As Struts Get In Way Of It...!

Here We Fit.....! AE101 Air Intake Box....! (y)

Time To Complete It....Here is My MAXSPEED 2.25" Free Flow Exhaust...!

Here It Is....!!

We Make Lil Curve On Bumper To Match It Perfectly So It Won't Hang And Bang On Bumps...!!

2.25" Downpiping We Hided...One Can't See Till He Gets Below Car....! Saved From Bumps And Height Speed Breakers Also...!!

Thats All For Today Work.....As All Work Almost Done...So We Might Finish Some Fitting Work And Move Onto Body Wiring Process Till We Fire-it Up..!
Regards