28th June, 2013 Update
Reached Workshop @ 9:30 am & work Started Till 10:10 am
1) H&R Rear 22mm Sway Bar Installed
2) Brake Clippers Painted Metallic Red/Orange
3) Rear Drilled/Slotted Rotors Installed
4) DEFI Guage Installed (Exhaust Temp, Water Temp, Oil Pressure)
5) Brake Service Done
6) Cat Delete Was Chock So Overhauled By Honda
7) Engine Tune Up By Honda
8) Mugen Air-press Installed
Came Back home 6:15pm
Rest Of work For Tomarrow.
29th June, 2013
Went To WorkShop 10:00 am
1) Try To Install Front Drilled/Slotted Brake Rotors
But It Was Not Possible As The New Rotors Were 1mm Thicker Then Stock
So Need To Replace With New Brake Clipper With Them .. Will Be Pending Till I Find New Setup.
2) H&R Front 28mm Sway Bar Installed 
3) Some Little Maintance Done.
Left The Work Shop @ 2:30pm As Had Offroading Plan With Frontier 4x4 Club
Many Major Work Has Been Done & Still I Felt Few More Good Products To Install Like Coilovers 
Sorry No Pixs Yet As It Was Tough Schedule For Me As I Cam Back To UAe on 30th June, 2013 @ 11pm
Soon Pixs Will Come