spanCalibri","sans-serif";"BeeMog Project Update
[/highlight]
spanCalibri","sans-serif";"I went to the killer as per my plan, Radiator has been replaced with a clean version :). It will go through the cleaning from inside today & will be installed in the evening. I have also got a 24V sealed beam replaced from him & lights were installed yesterday. Since, last weekend we are doing most of the tasks our self & itâs more than fun. Yesterday, we learnt to make the locks which can fix the sealed beam to the ring.
spanCalibri","sans-serif";"Today's target is to do some progress on diffs. I intend to change the color of my Mog in phase 3, it might happen earlier, however it wouldnât be disclosed till its arrival in the event.
spanCalibri","sans-serif";"Its genuine meters which I purchased last week havenât been installed yet & these will be installed on a metal sheet which will replace the stuff. I am thinking over its installation, either to take the whole Mog to the denter for this job, or just open the current sheet with meters which will give the idea of dimensions and take it to a fabricator to cut a sheet with same dimension but diameter bore should be as per the size of new Speedoz.
spanCalibri","sans-serif";"@DeeDee, I didnât found the doors for dala here

spanCalibri","sans-serif";", can you check its status in Tokhar? All of the spares have been shipped to Lahore by the killer, something is cooking there, I am sure U know what going on, do share your research findings on it â if safe to do so