I thought the rate would be based on sqft or material used + labor. But people are quoting based on different factors, per watt (which doesn't make sense), per panel, or just a lump sump amount.
and I'm getting quotes from 200K - 400K - really crazy. Isn't it just cheaper to go with a L3 structure then, if one has roof-space?