I have emailed you the files
Got them thanks
Voltronics Inverter (UPS) is available in Karachi - Imported from China at premium price have built-in charge controller and programmable to use WET / DRY Batteries./ Solar PV Cells - selectable option - 2.5 kw [rms] pure sine wave unit price is 35000 with 1 year warranty. It is self adjusting to charge 12 V batteries upto 400 amps capacity
branded upss r better than local or chinese one ........
0321-4997060
@myhondawhat will be the price for a 10kva apc 2hour backup with dry/gel batteries. plz pm
That would more than 0.5 million.
Bro what is the price of 1500va? And secondly which battery brand do you suggest to use with apc (2 x 150 amp batteries would be enough for 2 hour backup) for following items:
8 energy savers4 fans2 led tv + 1 lcd tv1 or 2 laptop chargers
Thanks
17,500 ... NARADA in case of dry cell .... AGS in case of liquid .... yes 150 amp ll be great for 2 hours ..... but its better to calculate ur load first in watts .. 1.5 kva makes 980 watts ...... n after cutting sum power of ups for heat dissipation 800 watt left for ur load ....... so check if ur total load is equals to 800 watts .......
PM replied !!!!!!!
4,50,000 for new with 32 internal batteries and 3,00,000 for used one with new internal batteries . warranty one year
What's the price of Schneider 4.5KW Hybrid inverter (XW4548) and Schneider 6KW Hybrid inverter (XW6048)?
There is a minor difference in the prices, hence we suggest you buy 6 KW Schneider. Prices however are stated below.
(XW4548): Rs. 625,000(XW6048): Rs. 655,000
first check ur load in watts
The price difference is almost 4* compared to infini ..!!
Are you sure about the price? The price quote I got last year was almost half of what you are quoting here. Rs. 318,000 for the 4.5KW and 340,000 for the 6KW. The source is the authorized distributor of Schneider in Lahore.
The price i gave you is the retail price for complete set and includes 1 inverter, 2 charge controllers and a control box.
Why is a separate charge controller required for Schindler ? It must have a built in one!
How often do solar panels need cleaning from dust layer ?
If there's no rain , very often
So a separate person is required for cleaning purpose when large scale systems are implemented.