Sounds like a plan. Let's see when is getting repainted. I have it with me for mechanical repairs.
Doing something or the other everyday.
Got 2 out of 4 engine foundations replaced today. The vibrations are minimal but still not zero.
Maybe il get the other 2 replaced aswell. Although the mechanic told me not too replace them and drive as it is. With the first 2 they were also telling me to replace one by one. As we unscrewed them both were broken.
The other 2 seem in better condition since they are visible front and and the front right one.
While mechanics were doing this. Got new door checkers, and chrome handles installed.
I have to install door cards. Will take out time to do that so that the interior is done with.
I have ordered a new gear knob and gear lever dust cover should arrive by tomorrow or Saturday latest.
After that I will get an inter cleaning job done.
Repaint might be scheduled for after Eid.