Time sure flies..I didn't realize that its been almost 4 months that I havent updated this thread. Work on the body shell is 90% done and the pan was POR'd and painted a long while back. It just remained propped up against a wall with all the rain in the monsoon months. I wasn't worried about its well being as it had received the best anti-rust treatment I could find. Ramzan is a slow month and combined with the heavier than normal rains this year, the project remained on hold.
Yesterday the pan was finally carried to an empty bay in Khalid's Sahibs domain and the putting back of the refurbished bits commenced.
The front beam was taken apart, cleaned inside out and re-painted. The next task is to put on the already rebuilt king/link pin knuckles back on. A new set of tie rod ends would also be installed at the same time.
The most interesting job would be the installation of the new German made brake cables which were bought in the US.
I will be posting more pictures soon.
