@talhawaleed
Hi,
Recently, I have ended up purchasing a local made UPS. The components are new but it has been assembled by my electrician. Specs are: 1000Watts, 24Volts. It has a trickle charging kit in it which according to the electrician charges the batteries even with very low voltage from wapda. He says that these UPSes dont require any stablizer before them.
Im running 2 85mp AGS battries that are new.
I got UPS installed yesterday, although loadshedding had been quite a lot but it has failed to charge battries at required rate!
The UPS output has been set at 240Volts, charging amps are 9.5 I think... but the UPS never trips down!! It was not even able to charge from 25.5volts to 28volts in 3 constant hours! It did not trip! wont it heat the battries? constant charging but not able to trip?? battries are new? i dont know why is it not tripping?
Now that tonight my battries were fully drained, please explain why the hell my electrician could not get it sorted out? What should i ask him to do now? I want my UPS to get back to full voltage(28volts) within 1 hour after 1 hour of leadshedding...
what do u suggest? where the problem is?
PS. My UPS's casing made loud sound when I turned off everything else and just used 1 fan (no lights no nothing) I think the electrician is trying to make adjustments while trying to get rid of the Goonjh at the same time... What is this sine wave thingy? can a pure sine wave kit help?