Hi all, sorry for being absent for long time. Actually my father had heart problem and he has to go through angio plasty so was away from the project.
Update is that the suspension is all overhauled with new bearing and seals etc. And now the jeep has been given for engine fitting which is now under process and will finish it in a day or so.
A problem arised in fitting that the engine could not be coupled in original gear position. Which was solved by moving the gear a bit forward (arounf 3inches). Now i'm attaching the pics (sorry for bad quality as I was using my cell phones camera)
Empty Engine Bay

The Engine (3ct)



Pulling the Engine Up

Pulling it Up

Pusshing the Engine in its Bay


Realizing that the gear is to be moved forward

The gap between the engine and gear box

Turbo turbine

Another view

I liked this view
