I tried going to DHA office on thursday and they didn't let me in and said appointment leni paregi..but i called someone in DHA and they got me the info i needed.
Regarding roof top panel mounting, i haven't seen a single house in dha with those structure panels on roof. if they have panels on roof they are usually one panel angled or maximum 2 small ones. i could be wrong so its always better to ask DHA because they dont want structure pillars on roof. they could say its not safe bla bla so although they allow a maximum height, it doesnt mean you can put up high panel structures.
Regarding equipment, i have always wanted to source my own equipment so i can be sure of quality. Like i can check each panel for scratches or dents, but if you hire a turn key company, jo agaya woh apka, could be used, you never know and they usually ask you for 100% payment before delivery and installation of all equipment is made to your home.
I got quotations from Nizam energy, Sky electric and Hadron solar. I told these companies what i wanted i.e. huawei 36 kw inverter and mono perc panels. For sky electric i asked for 22 KW setup and for the other 2 i asked for 25KW panels.
1. Nizam energy is giving me 25 KW panel + Huawei 36 KW inverter plus installation and net metering etc for 21 lacs.
2.Hadron is doing it in 18 lacs Without net metering (They did not quote net metering and typed FOC) now foc could mean free of charge because in customer scope for net metering they have written i have to provide disconnect switch and earthing
3. Sky electric is doing 22 kw panel (I told them 22 kw) for 20.70 lacs which is expensive for 22 KW panel
i personally like Nizam energy, their proposal had the most details, with projected energy injected in grid, all charts, amount of generation in 25 years projected.
You can tell each company what product/inverter and what kind of panel you want, they will make you a proposal based on your required brands. so dont ever just go with what they assess.
I'm going to get my transformer issue resolved and then will wait a bit for Canadian Solar 590 Watt mono perc panel to reach pakistan (already released in canada).
Also you should go with a company that gives least quotation with good repo because net metering is not easy to do, earthing, grounding, disconnect switch etc requires professionals.
Also angle, and installation of panel is of supreme importance. if there is even a little bit of shadow on a Poly panel, it highly affects current generation. So engineers should properly identify angle, check for shadow on roof and then finalize. watch youtube video https://www.youtube.com/watch?v=UNPJapaZlCU&t=91s to see how shadow affects panel.
All three companies above are AEDB recognized.