@haidi123
exactly...
plus the whole Nazimmudin road from f-6 to f-11 has been doubled, almost complete..
the expressway from pindi stadium road... passing through the green belt between i-9 and i-8 h9 and h8 passing through peshawer morh..uptill the margalla road between f-9 and f-8... 2 underpasses are under construction on that express highway...
plus the Citibank intersection of blue area on islamabad highway... a huge underpass is underconstruction over there... besides centaurus..
2 more underpasses are under construction at china chowk intersection... ..
a new road is under constuctoin with the fazle haq road (the back side road of blue area..)
one or two other underpasses are being constructed on the thirs expressway which will connect aabpara road to margalla road...
plus the current main blue area road.. has been extended and made into a 4 lane road on each side... earlier it was a 2 lane road on each side..
thats as much as i can remember now....