Ok, I have decided in principle to re-do the whole Mutt. But 1st I need to take care of a few things and add a little bit more stuff. After that I do a paint strip of the floor and then an OD green paint.
All this shall be done by myself and since there's very little time after work, this is going to take a few weeks :S
Started off with the front, taking care of nasty dents.


Prepped with 2 coats of primar and let to dry over night.


The new, 2nd gerrycan holder, thanks to Mohsin.

Gerry in place, temp fixture so see the fitting.

The red light, wasn't looking good in red so I've decided to paint it too.
(1st two coats were applied last night, will dry & let to sit till today, since I get time after work, most of the pics are taken at night time)



Next, comes the 2nd spare wheel (that too thanks to Mohsin's arrangement), I think I'll have to re-install the rear sear again, due to technical fitting issues.