UPDATES
Suspension: The front suspension beam is on, so are the tie-rod ends and ball joints.
Brakes: The front and rear brake drums are on, the rear brake lines have been installed. The front brake drum lines will be installed within a couple of days.
Steering box: The complete assembly is on and is so far so good, the OEM steering wheel is on aswell.
Pedal assembly: It was installed a few days ago, but it'll have to be taken out again for a recheck and for the installation of the acclerator and clutch cable.
Stuff pending: The front suspension beam hydraulic shock foundation bolt and nut is missing, need to get OEM wheel nuts, need to get the exhaust packing, brake switch, brake master cylinder nozzle is required aswell as the brake master cylinder rubber seal.
P.S: Pictures will be uploaded within a few days.